Sunday, June 22, 2014

First test with the Plano boxes. In order to take out the lowest box overlying box must be removed

Marcraft Pike Master - Storage Box, Storage compartment for Plano Boxes | Predator Hunters
2012 oxbow lake fishing trout Baitcaster Bass Bass Black Flagg boat buck Danube Esox fishing fish fishing river trout Fuji waters Guiding rubber fish Hearttbreaker Pike Jerk Jerkbait Jig Lake Lipno Marcraft Pike Master predator tehnomanija hunters asp Rod Building Rod Building Sea Shad spin fishing dam tours trips vertically Waller Wallsee catfish Zander
When buying tehnomanija the boat I was concerned that I have a big livewell tehnomanija to the fish to gain enough space. After almost 3 years I have been enriched by the experience that I equal in large net let "trophy fish" in the water and release for you for a photo and "cuisine tehnomanija fish" which are now and then brought tehnomanija me, have a smaller livewell enough space.
The idea was obtained by the reduction tehnomanija of the Livewells to use the space for additional bait boxes, especially since the space is there ideal, since the depth of the Livewell exactly sufficient for the Plano boxes. Said and done. But as I put my idea to work in detail? How do I get the Livewell tight again? Must be welded here? Questions for which I need aluminum welding professionals and have experience with the material. Of course I could go to Holland and let make the changes tehnomanija directly at Andre of Marcraft, but a trip to Holland was not in the near future in the program. As luck would have it, Harald filed a fishing buddy with a lot of experience on the topic of aluminum welding (he already has two Aluboote self built), with me and together we found a (for me) optimal solution.
To open, we have a closure with spring tehnomanija mechanism chosen snaps as soon as the door is closed. Thus, a rapid closing of the boot tray for Plano boxes is guaranteed. The shutter is mounted behind the hole.
First test with the Plano boxes. In order to take out the lowest box overlying box must be removed first. This is no other way, as we would otherwise only accommodate 4 boxes can. Since it does not really tehnomanija bother and we were able to accommodate an additional box, we have chosen the solution.
Sides, we have also used a sheet metal and bent up so that the water from the livewell can not inject to the boxes over. This area is bonded and covered up even with carpet. Bonds is because during tehnomanija welding caused to high temperatures that would damage the carpet.
Here you can see the "snap lock" once again very good. It was voted an extra large opening at the front in order to open the lock quickly and easily, even with gloves (winter) can.
CAPTCHA Code: *
You can use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> tehnomanija <code> < del datetime = ""> <em> <i> <q cite=""> <strike> tehnomanija <strong>
01 Shops 1 - BIG FISH Adventure 1 - Black Flagg Austria 1 - Lagatzo Custom Lures 2 - 3 Topwater Productions - Underwater casing 5 - Marcraft Aluboote 8 - CH Rod Building & Repair
Powered by WordPress and the Graphene Theme.

No comments:

Post a Comment